The Floor Plan, and Left & Right Elevations
. .
    They started on05/21/2007. On 06/04/2007 they were ready to pour the cement.
. .
          The floors were poured, and wood and trusses were delivered.
. .
          The house is well underway. The last 3 are as of 06/13/2007.
. .
      These Photos are from 6/18/2007
. .
  These Photos are from 6/18/2007
. .
These Photos are from 7/05/2007.
. .
These Photos are from 7/09/2007.
. .
These Photos are from 7/31/2007.

The outside is painted Lt green with green trip. The drywall is done, and knock down on the ceiling is done.

. .
These Photos are from 8/02/2007.

Work on the stair rails and fireplace was started.

. .
These Photos are from 8/17/2007. The living room side of fireplace.
. .
These Photos are from 8/20/2007. The bedroom side of fireplace.
. .
These Photos are from8/24/2007. The kitchen is almost done. The master bath vanity is going to be remade.

 

. .
    Here are some views of the outside.
. .
      The style of the stair rails were changed to make it look better.
. .
  The Hall Bath vanity and shower.
. .
      The Master Bath vanity was completely rebuilt and looks much better.

The glass on the shower was finished.

. .
  We had the stove and refrigerator delivered while we were there.