The fuselage and strut kits were delivered
and inventoried. 7/22/2008 |
. |
|
|
I immediately started cutting and fitting the
left side on the lay out table. |
. |
|
|
The left and right sides are being connected
together. Everything was jigged and plumbed to make sure it comes out
straight. |
. |
|
|
Then the bulk of the welding began, and went
on and on. I kept turning the fuselage over to make it easier to weld. |
. |
|
|
Here the wing and tail mounting pieces have
been added. |
. |
|
|
The welding is coming along. The top
structure, window parts, and boot cowling attachment points are in place.
9/15/2008 |
. |
|
|
Spraying the primer on the fuselage. The
boards on both ends allow me to rotate it around. I also put little wheels
on one end so that I can move it around. 10/5/2008 |
. |
|
|
Received the parts for landing
gear, flight controls and tail group. |
. |
|
|
Inventorying the parts,
constructing the mounts for the brakes |
. |
|
|
Making the landing gear. |
. |
|
|
Making the tail group parks. |
. |
|
|
The tail group mounted to the
fuselage. |
. |
|
|
It barely fits in the garage now.
Made a plate for the engine where the old vacuum pump was. |
. |
|
|
The engine mounted with the
cooling shrouds (eye brows). |
. |
|
|
Working on the engine exhaust. I
had to modify the pipes to fit under the alternator. |
. |
|
|
Working on the electrical system,
and finished the brakes. |
. |
|
|
The fuel header tank behind the
instrument panel. All of the fuel lines are finished and connected. Most of
the wires are cut and in place. |
. |
|
|
The left wing is nearly complete. |
. |
|
|
With Jeans help we were able to
test fit it to the fuselage. |
. |
|
|
I remembered to take some
pictures on this wing. |
. |
|
|
The first wing is hanging from
the ceiling. |
. |
|
|
I started applying the fabric to
the cockpit area. |
. |
|
|
And painted a few of the pieces
Cub Yellow. |
. |
|
|
|
. |
|
|
The final coat of the pink is
done on all the pieces except the wings and ailerons. |
. |
|
|
Here it is with the 3 coats of
silver. |
. |
|
|
And with one base coat of white.
The Cub Yellow is on back order. |
. |
|
|
Finally got the Cub Yellow paint
on, and started to reassemble some parts.
03-04-2009 |
. |
|
|
The engine is mounted, and
working on the exhaust pipes. |
. |
|
|
Right side pipe is finished and
painted. The left side pipe is tack welded. |
. |
|
|
The wiring is all connected and
secured. |
. |
|
|
The tail parts are all assembled,
and test fit the wings. |
. |
|
|
The engine started right up, and
I taxied around the front yard. |
. |
|
|
Moved every thing back to the
pole barn. |
. |
|
|
Started finishing the wings. |
. |
|
|
|
. |
|
|
|
|
|